GRIMES, Iowa – Work to repair and widen the Interstate 35/80 bridge over the Des Moines River will detour trail users of the Neal Smith Trail for their safety on a signed detour until summer 2021, weather permitting, according to the Iowa DOT.
The detour for trail users began Sept. 9.