Asbestos Webinar Materials

The training webinar videos are provided below as found on our YouTube Channel. Contact Air Quality at 515-725-8200 and ask for Jason Dowie if you experience problems playing the videos.

*A comprehensive User Guide is also available: Asbestos Notification System User Guide

Asbestos Notification System Training Materials:
Video 1: Create Account
Video 2: Manage Account
Video 3: Asbestos Abatement Building Notification
Video 4: Demolition Building Notification
Video 5: Emergency Renovation Building Notification
Video 6: Ordered Demolition Building Notification
Video 7: Renovation Building Notification (video not ready at this time)
Video 8: Asbestos Abatement Bridge Notification
Video 9: Demolition Bridge Notification
Video 10: NESHAP Notification of Training Fire
Video 11: Controlled Burn of Demolished Building Notification
Video 12: Search—Revision—Canceled Notification

Asbestos Webinar Videos


Step-by-step instructions for creating a user id, password rules, security questions, identity proofing and electronic signature.
 

 


Instructions for changing password, changing security questions, updating contact information and updating permit number.
 

 

Step-by-step instructions for creating a notification for the removal of asbestos containing materials from a building. Includes identifying the location, size, and use of building, building owner, project operator, abatement contractor, amount of asbestos, asbestos inspector, method to contain asbestos, waste hauler and online payment.
 

 

Step-by-step instructions for creating a notification for the demolition of a building after asbestos removed. Includes identifying the location, size, and use of building, building owner, project operator, demolition contractor, asbestos inspector, method to remove building materials, waste hauler and online payment.



Step-by-step instructions for creating a notification for the renovation of a building containing asbestos based on an emergency situation such as burst pipes. Includes identifying the location, size, and use of building, building owner, project operator, abatement contractor, amount of asbestos, asbestos inspector, method to contain asbestos, waste hauler, details of emergency situation, and online payment.



Step-by-step instructions for creating a notification for the demolition of a building containing asbestos based on unsafe work conditions due to risk of imminent collapse. Includes identifying the location, size, and use of building, building owner, project operator, demolition contractor, amount of asbestos, asbestos inspector, method to contain asbestos, method to remove building materials, waste hauler, municipal authority issuing order, and online payment.


 

Step-by-step instructions for creating a notification for the removal of asbestos containing materials from a bridge. Includes identifying the location and size of the bridge, bridge owner, project operator, abatement contractor, amount of asbestos, asbestos inspector, method to contain asbestos, waste hauler and online payment.



Step-by-step instructions for creating a notification for the demolition of a bridge after asbestos removed. Includes identifying the location and size of the bridge, bridge owner, project operator, demolition contractor, asbestos inspector, method to remove bridge materials, waste hauler and online payment.



Step-by-step instructions for creating a notification of a proposed burn for the purposes of bona fide training of public or industrial employees in fire fighting methods. Includes fire department contact information, location and dates of the fire, details about the building, asbestos inspector, and details about any asbestos containing materials.



Step-by-step instructions for creating a notification of the controlled burn of a demolished building. If the proposed burn does not meet the definition of a training fire, a city may be able to conduct a controlled burn of a demolished building burn. Includes fire department contact information, location and dates of the fire, details about the building, asbestos inspector, and details about any asbestos containing materials.


 

Step-by-step instructions for finding existing notifications, revising and canceling notifications.




eAirServices - Online Training


SLEIS Webinar Materials

The training webinar videos are hosted on YouTube and may be played on any compatible device or app. Contact Jason Dowie at 515-204-3749 if you experience problems playing the videos.

State and Local Emission Inventory System (SLEIS) Training Materials

Complete playlist available here.




If you have problems with the files or have questions, please contact the SLEIS HelpDesk.